DOD Contract : SPM4A710D5530 | SPM4A7-10-D-5530
There are 12 government contract actions against this contract, with quantities ranging from 3 and 66. Execution of this contract spans from June 6, 2010 and December 12, 2014. The procuring agency is 97AS: Defense Logistics Agency.
It has been awarded to AERO ENGINEERING & MANUFACTURING COMPANY OF CALIFORNIA located in , CA.
The item name for this contract is: SPRING,TIE-DOWN RIN.
Back to Agency List | Recent contract actions | |||||
DOD Contracts | Delivery Order | Line Item | Quantity | Price | Agency | Award Date | spm4a710d5530 | 0007 | 0001 | Free Trial | 97AS: Defense Logistics Agency | 2014-12-07 | spm4a710d5530 | 0007 | 0002 | Free Trial | 97AS: Defense Logistics Agency | 2014-12-07 | spm4a710d5530 | 0006 | 0002 | Free Trial | 97AS: Defense Logistics Agency | 2014-11-17 | spm4a710d5530 | 0006 | 0001 | Free Trial | 97AS: Defense Logistics Agency | 2014-11-17 | spm4a710d5530 | 0005 | 0001 | Free Trial | 97AS: Defense Logistics Agency | 2014-10-08 | spm4a710d5530 | 0004 | 0001 | Free Trial | 97AS: Defense Logistics Agency | 2014-09-03 |
---|---|---|---|---|---|---|
Back to Agency List | See all SPM4A7 contracts |
Federal Supply Classes for SPM4A710D5530
1560 - Airframe Structural Components
Includes: Includes Flight Control Surfaces; Internal and External Auxiliary Fuel Tanks; Exhaust Systems; Pylons, Trim Tabs; Aircraft.
Excludes: Excludes Fitted Covers; Helicopter Rotor Brake System Components; Aircraft Loose Equipment and Alternate Mission Configuration Equipment stored on board the aircraft.
Note: Note-This class includes fabricated system parts that are permanently attached or peculiar to the integral airframe of an aircraft, such as support structural components, spars, ribs, ailerons, stabilizers, bulkheads.